ICL White City Campus, London

Status: Complete

Client: ISG Plc

Sector: Commercial Sprinkler, Wet Riser

Location: Imperial College London, White City Campus

Duration: 48 weeks

Value: £1.2 million

Background:

The project involved the design, installation, testing and commissioning of sprinkler base build and fit out of new Building E at ICL West City Campus.

The Design and Construction of The Michael Uren Biomedical Engineering Research Hub (The “BmE Hub”) at Imperial West Campus, White City.

This new build laboratory and office building consists of 13 floors with one further basement level. The GIFA is circa 18,150m2 plus external works. The building will provide laboratory and office space for interdisciplinary, translational research initiatives at the interface of biomedical sciences and engineering and includes a clinical facility at White City Campus, White City.

 

Do you have a project you wish to discuss?

8 + 9 =